Subsea Intervention Systems

TIS Multiple Quick Connect (MQC) Stab Plates are designed to enable hydraulic and electrical connection between subsea control equipment such as Trees, UTAs & SDUs.

Built to perform multi-disciplinary operations during a single mobilization, subsea well intervention packages are a major asset in increasing time efficiency.

  • Fabrication, pipefitting, and mechanical assembly of client’s proprietary subsea systems
  • Engineering & project management support
  • Integration with topside equipment
  • Workshop space
  • Supply of accompanying topside equipment
No entries found.

Make an enquiry

Related Products