40ft – 60ft units are available with telescopic boom, integrated powerpack and an AHC systems comprised of the latest computing hardware and software to ensure optimum processing speeds when calculating for heave compensation.
DNV-ST-E271 & DNV-ST-E273 Certification
DNVGL-ST-0378 Certification
Telescopic Boom c/w Automatic Latching System
AHC Hydraulic Winch System
Colour coded Guy Rope Set
Integral Powerpack
Mast Head Marker Beacon
Limit cut-out switches
Optional Hand Winch for sheave deployment
No entries found.
No entries found.