Wireline Masts

TIS Wireline Masts are designed to position a surface well intervention manifold onto the wellhead and assist in the deployment of wireline into the top of the manifold rig-up.

40ft – 70ft units are available via both telescopic or folding boom types, retaining an operator friendly build that allows for easy maintenance in the field.

  • ATEX & IECEx Dual Certification
  • DNV-ST-E271 & DNV-ST-E273 Certification
  • DNVGL-ST-0378 Certification
  • Telescopic or Folding Type Boom
  • Hydraulic Winch System
  • Colour coded Guy Rope Set
  • Optional Hand Winch for sheave deployment
  • Optional Integral Powerpack
No entries found.

TIS LWI Systems Brochure

TIS Manufacturing has extensive experience in the provision of equipment and services specifically for LWI operations.

TIS Well Intervention Brochure

TIS Manufacturing is a specialist in the design, manufacture, refurbishment and rental of well service and subsea control equipment for the oil and gas industry.

TIS Wellhead Control Panel (API 16D & SIL2) Brochure

TIS Manufacturing recently delivered a HP/HT 18-Function Wellhead Control Panel (API 16D & SIL2) for the operator on the Culzean Field, offshore UK.

TIS Wireline Masts Brochure

TIS Wireline Masts are designed to position the lubricator stack onto the wellhead and to assist in feeding the wire into the top of the stack during well service operations.
No entries found.

Make an enquiry

Related Products